Formula 1 officially entered its mandatory shutdown period after the Hungarian GP. For two weeks, teams must halt a series of activities related to car development, as mandated by FIA regulations, even though the ‘holiday’ period is longer, equivalent to three weeks.
Read more F1: Briatore defends Sprint races in all 24 calendar events
This measure goes beyond a simple break in the calendar. The goal is to reduce costs and ensure a rest period for team professionals, preventing the technical battle from continuing during the interval between season rounds, and stopping teams with larger budgets from gaining an advantage by maintaining continuous development.

The mandatory shutdown was incorporated into the Sporting Regulations over a decade ago, and after subsequent updates, it adopted the current format of 14 consecutive days. Besides this mid-year break, there is also a similar period during the year-end holidays. Each team pre-defines with the FIA when it will observe its shutdown window, which must occur between July and August.
In 2026, the calendar placed this interval between the Hungarian GP and the Dutch GP. The race at Hungaroring was held between July 24 and 26, while the championship will resume between August 21 and 23, in Zandvoort. Although the gap between races is longer, the regulatory shutdown remains limited to 14 consecutive days, with most teams starting this period on Monday, August 3, until August 17.
Read more F1: Herta’s season in F2 casts doubt on Cadillac’s plans

During this interval, activities that contribute to car performance are prohibited. This includes wind tunnel work, CFD simulations, development of new concepts, parts, systems and updates, manufacturing and assembly of components, as well as technical communications related to the design, development or production of the car. The intention is to prevent any formal progress in equipment development during the break.

Not all operations, however, need to be stopped. The regulations allow administrative activities, facility maintenance, logistics preparation that does not involve current car components, projects unrelated to Formula 1, and work on demonstration cars, provided they do not use parts from the season. Repairs on cars damaged before the shutdown can also be carried out, provided they are approved by the FIA. After the 14 days end, factories are free to resume their Formula 1-related activities normally.
Read more F1: Racing Bulls uses Verstappen as an example for young people